Completed Hunt Club structural beam restoration in San Juan Capistrano, California

WRP SIGNATURE PROJECT

Hunt Club Structural Beam Restoration

This San Juan Capistrano wood beam restoration project at the Hunt Club addressed deteriorated exposed beams that were facing a replacement proposal reportedly exceeding $1 million because the work would have required roof removal and beam replacement. WRP reviewed the project, developed the restoration approach, trained the contractor’s crew, supplied the complete WRP Wood Restoration System, and provided ongoing technical guidance. The restoration was completed for under $100,000.

$1M+ Replacement Proposal Reported proposal involving roof removal and beam replacement.
On-Site Crew Training WRP trained the contractor’s crew on the complete restoration process.
Under $100,000 Reported cost to complete the restoration project.

PROJECT SNAPSHOT

A High-Stakes Alternative to Complete Beam Replacement

Severe deterioration affected exposed structural and decorative beams throughout the property. WRP developed a targeted restoration approach that allowed the contractor to preserve sound original wood, rebuild the damaged areas, and avoid the extensive demolition associated with removing the roof and replacing the beams.

Location

Hunt Club, San Juan Capistrano, California

Project

Exterior structural and decorative beam restoration

Original Proposal

Reportedly more than $1 million for roof removal and beam replacement

WRP’s Role

Project review, restoration planning, crew training, materials, and technical guidance

Reported Outcome

Project completed for under $100,000

BEFORE RESTORATION

Advanced Wood Deterioration Across Critical Beam Areas

The project photographs document different damaged areas rather than direct before-and-after pairs. Together, they show severe moisture-related deterioration, open cavities, weakened wood fibers, and extensive material loss at exposed beam ends.

Multiple deteriorated exposed wood beams at Hunt Club before restoration

Widespread Beam Deterioration

Multiple exposed beam ends showed weathering, decay, and significant material loss across the property.

Rotted structural wood beam end before restoration at Hunt Club

Advanced Beam-End Decay

Prolonged moisture exposure had deteriorated the beam ends beyond a surface-level repair.

Close-up of deteriorated wood fibers in a structural beam before repair

Deteriorated Wood Fibers

The close-up condition revealed weakened and missing fibers that required removal before rebuilding.

Severely deteriorated exposed wood beam at Hunt Club before restoration

Severe Localized Material Loss

This additional project view shows how deeply the exposed beam had deteriorated, leaving irregular cavities and too little sound surface for a simple cosmetic patch.

WRP ON-SITE CONTRACTOR TRAINING

San Juan Capistrano Wood Beam Restoration Process

WRP provided hands-on instruction for this San Juan Capistrano wood beam restoration, including evaluation, preparation, rebuilding, shaping, and final surface refinement.

WRP providing on-site contractor training for the Hunt Club beam restoration project

On-Site Contractor Training

WRP reviewed the project with the crew and demonstrated the restoration approach and proper application methods.

Contractor applying WRP Repair Dough to rebuild a damaged structural beam

Rebuilding Missing Wood

WRP Repair Dough was applied to rebuild missing beam sections and restore the original dimensions.

Contractor shaping WRP repair material during structural wood beam restoration

Shaping the Repair

The rebuilt material was shaped and profiled to recreate the original beam geometry.

WRP Topping Compound being applied to match the texture of a restored wood beam

Matching the Surface Texture

WRP Topping Compound refined the surface and recreated the texture needed for a seamless painted finish.

COMPLETED PROJECT

Restored Beams Integrated with the Original Architecture

After rebuilding, shaping, surface refinement, priming, and painting, the repaired areas blend into the property’s existing beam profiles while retaining the original architectural character.

Completed exposed structural beam restoration at the Hunt Club

Completed Structural Beam Restoration

The exposed beam system was restored, finished, and painted while retaining the original architectural design.

Restored exposed wood beam system after completion at the Hunt Club

Restored Exposed Beam System

Multiple repaired beam ends were preserved in place, avoiding the extensive demolition associated with replacement.

Finished restored beams blending with the Hunt Club architecture

Preserved Architectural Character

The completed repairs blend with the surrounding structure and maintain the property’s original appearance.

Completed Hunt Club beam restoration showing the rebuilt profile

Rebuilt Beam Profile

Damaged sections were rebuilt and shaped to match the original beam dimensions before final coating.

Close-up detail of a completed restored wood beam at the Hunt Club

Finished Repair Detail

The finished surface shows clean transitions between the restored area and the retained original wood.

Final craftsmanship detail from the Hunt Club wood beam restoration project

Final Project Craftsmanship

The completed work demonstrates how targeted restoration can preserve existing timber elements.

PROJECT OUTCOME

A High-Value Alternative to Extensive Structural Replacement

The completed San Juan Capistrano wood beam restoration demonstrates how a properly evaluated repair can preserve existing structural wood, reduce demolition, and avoid the cost and disruption of full replacement when enough sound material remains. This preservation-first approach also aligns with guidance from the National Park Service Historic Preservation program.

Original Beams Preserved

Sound portions of the existing beams remained in place instead of being removed unnecessarily.

Roof Removal Avoided

The restoration strategy avoided the major demolition reportedly required by the replacement proposal.

Contractor Crew Trained

WRP provided practical, project-specific instruction so the crew could execute the repair system correctly.

Major Reported Cost Reduction

The project was reportedly completed for under $100,000 versus a replacement proposal exceeding $1 million.

RESTORE MORE. REPLACE LESS.

Planning a Complex Wood Restoration Project?

Start by sending WRP clear photographs of the damaged wood. We review the visible conditions and determine whether the project may be a good fit for the WRP Wood Restoration System or selective project assistance.